EVI-LOCATE
Create Project
Enter your project details to begin your EV charging site assessment.
EV charging installation
Define Site Boundary
Click the map to place boundary points. Click the first point again to close the boundary.
Site name
Utility provider
No boundary drawn yet
Select Electric Vehicle Charger Type
Select a generic charger for planning, or create a custom configuration from GSA's EV Charger blanket purchase agreement data.
OR
None placed yet
Manage Transformers
Identify whether you need new transformers to support your EV chargers.
None placed yet
Manage Service Panel
Click within the site to place the service panel. Only 1 allowed.

These questions will help you identify whether you need a new service panel to support EV Chargers or have sufficient physical and electrical capacity to use your existing service panel. You can default to a new service panel if you would like. If you do not know the answers to the questions below, you can default to a new service panel or contact us at EVI-LOCATE@nlr.gov

Would you like to include the cost of a 208V service panel to support your AC Level 1 or Level 2 charging stations?

Selected EV Chargers:
EV Charger Level
Total Number of EV Charger Ports
Details:
Amperage

Where will the service panel be installed?

Do you want to add a new service panel or upgrade an existing service panel?

None placed yet
Review Design
Lines show electrical connections between components.
480V transformer → DC chargers
480V transformer → 208V transformer
208V transformer → service panel
Service panel → L1/L2 chargers
View Site Report
Your cost estimate results are shown on the right. The map displays your full site design.
Click to add points · click first point to close
Draw the site boundary to continue
Site Report
Estimate Cost
Inputs for —
Project Costs (%)

EVI-LOCATE includes default numbers for project costs that can be modified by the user. Please update any of these defaults as appropriate for your project.

State and Local Sales Tax Percent
0%
Contractor Overhead Percent
15%
Contractor Profit Percent
10%
Bond Costs Percent
2.5%
Permits and Zoning Percent
2%
Contingency Cost Percent
20%
Site Report
Your full site assessment report will be generated here as a downloadable PDF.